DOCK REPAIRS - B.O.A. REPORT
Alamitos Bay Marina
October 11, 2011 – November 7, 2011
• Gwy 6 – repaired the pile pocket and installed a new rub block.
• Gwy 7 slip 156/157 – installed a new finger and repaired the splice.
• Gwy 10 slip 190 – repaired the substructure and knee brace and replaced a portion of the rub rail.
• Gwy 11, near the end tie – repaired the keen brace and re-nailed several loose boards.
• Gwy 13 slip 270 – replaced two cleats and tightened all the other cleats on at the slip.
• Gwy 14 slip 305 – replace a pontoon.
• Gwy 15 slip 411 – repositioned two pontoons.
• Gwy 17 slip 571 – installed a new finger.
• Gwy 17 slip 573 – installed a new finger, replaced the knee brace and repaired the splice.
• Gwy 18 slip 628/630 – repaired the substructure and replaced the knee brace.
• Gwy 19 slip 691/693 – repaired the substructure, re-nailed several boards on slips 691 and re-nailed all the boards on slip 693.
• Gwy 19 slip 695/697 – repaired the substructure.
• Gwy 29 slip 1243 – replaced two dock wheels, a portion of the fascia and a portion of the rub rail and repaired the splice.
• Gwy 33 slip 1529 – replaced two corner bumpers.
• Basin 5 slip 1823 – installed a new finger, repaired the substructure and installed a pontoon.
• Long Dock North – replaced a portion of the bull rail.
• Mothers’ Beach Dock – pumped out the pontoons.
• Fire Station 21, isolation dock – re-nailed a portion of the fascia and repositioned a pontoon.
Long Beach Shoreline Marina & Rainbow Harbor/Marina
• Gwy Q – replaced all the screws along the ramp.
• Gwy GG slip 17 – repaired the detached cable on the dock box.
|