As the ABM rebuild is underway, the Maintenance Department continues to keep the rest of the marina afloat; the status of the docks substructure is now in a state that it has forced the maintenance department to move to a complaint driven type of schedule. There are so many areas in need of repairs, with warped boards and nails no longer finding a solid surface to hold to, and with the substructure coming apart, to the extent that the floats are barely or at times not able to support the weight. As you can see by the report on the right, the Maintenance Department is doing a great job of keeping the marina afloat

DOCK REPAIRS - B.O.A. REPORT



Alamitos Bay Marina



October 11, 2011 – November 7, 2011

• Gwy 6 – repaired the pile pocket and installed a new rub block.
• Gwy 7 slip 156/157 – installed a new finger and repaired the splice.
• Gwy 10 slip 190 – repaired the substructure and knee brace and replaced a portion of the rub rail.
• Gwy 11, near the end tie – repaired the keen brace and re-nailed several loose boards.
• Gwy 13 slip 270 – replaced two cleats and tightened all the other cleats on at the slip.
• Gwy 14 slip 305 – replace a pontoon.
• Gwy 15 slip 411 – repositioned two pontoons.
• Gwy 17 slip 571 – installed a new finger.
• Gwy 17 slip 573 – installed a new finger, replaced the knee brace and repaired the splice.
• Gwy 18 slip 628/630 – repaired the substructure and replaced the knee brace.
• Gwy 19 slip 691/693 – repaired the substructure, re-nailed several boards on slips 691 and re-nailed all the boards on slip 693.
• Gwy 19 slip 695/697 – repaired the substructure.
• Gwy 29 slip 1243 – replaced two dock wheels, a portion of the fascia and a portion of the rub rail and repaired the splice.
• Gwy 33 slip 1529 – replaced two corner bumpers.
• Basin 5 slip 1823 – installed a new finger, repaired the substructure and installed a pontoon.
• Long Dock North – replaced a portion of the bull rail.
• Mothers’ Beach Dock – pumped out the pontoons.
• Fire Station 21, isolation dock – re-nailed a portion of the fascia and repositioned a pontoon.


Long Beach Shoreline Marina & Rainbow Harbor/Marina



• Gwy Q – replaced all the screws along the ramp.
• Gwy GG slip 17 – repaired the detached cable on the dock box.